Int 0229-2010
Energy efficiency requirements for certain capital projects.
IntroductionFiledCommittee on Environmental Protectionintroduced 2010-05-12
Filed — closed without being enacted.
Official record · Legistar
Agenda: 2010-05-12Passed: 2013-12-31
Committee on Environmental Protection — Department of Environmental Protection and Office of Long Term Planning and Sustainability and Office of Recovery and Resiliency.
How it compares
38% of similar bills passed
19 passed · 31 died
This bill: 1329 days in committee
Similar bills: median 571 days · 195 days when passed
Compared against 50 Introduction bills in Committee on Environmental Protection.
Ranked by how closely each matches this bill's topic — closest first:
Int 0379-2006
Energy efficiency requirements for certain capital projects.
1297dFiled
Int 0967-2009
Requiring energy audits and retro-commissioning of base building systems of certain buildings and retro-fitting of certain city-owned buildings.
229dEnacted
Int 0564-2007
Establishing a New York city energy code.
959dEnacted
Int 0411-2006
Creation of a comprehensive energy policy and public awareness city-wide of energy efficiency and conservation measures.
1233dFiled
Int 0476-2006
Benchmarking the energy and water efficiency of buildings.
1118dEnacted
Int 0017-2010
Zero carbon emission buildings.
1427dFiled
+ 44 more comparable bills
Sponsors (9)
Lifecycle
IntroducedIntroduced by Council
2010-05-12 · City Council
ActionReferred to Comm by Council
2010-05-12 · City Council
ClosedFiled (End of Session)
2013-12-31 · City Council
Heard at (1)
City Council · 2010-05-12 · 1:30 PM · Council Chambers - City Hall
Full text
Be it enacted by the Council as follows:
Section 1. Subparagraph iii of paragraph 2 of subdivision b of section 224.1 of the New York city charter is amended to read as follows:
(iii) Capital projects involving buildings classified in occupancy group G with an estimated construction cost of 12 million dollars ($12,000,000) or more shall be designed and constructed to reduce energy cost by a minimum of twenty percent (20%), as determined by the methodology prescribed in LEED energy and atmosphere credit 1 or the New York state energy conservation code, whichever is more stringent. In addition to such twenty percent (20%) reduction in energy cost, the design agency shall make investments in energy efficiency that reduce energy cost by an additional [five percent (5%) if it finds that the payback on such investment through savings in energy cost would not exceed seven years or, in the alternative, the design agency shall make investments in energy efficiency that reduce energy cost by an additional] ten percent (10%) if it finds that the payback on such [investment] investments through savings in energy cost would not exceed seven years. If the payback for such investments would exceed seven years, then the design agency shall instead make investments in energy efficiency that reduce energy cost by an additional five percent (5%) if the design agency finds that the payback for such investments would not exceed seven years.
§2. Section 224.1 of the New York city charter is amended to add a subdivision l to read as follows:
l. An annual report shall be prepared no later than September 1 of each year in accordance with the procedure and format established by the department of design and construction. Such report shall include, but shall not be limited to, a list and brief description, including square footage and total cost, of any capital project subject to section 224.1 of the charter, completed during the preceding calendar year; the estimated level of LEED certification such capital projects have achieved as determined by the design agency in accordance with the LEED rating system or, if applicable, the level achieved, as certified by the United States green building council; additional costs attributable to complying with the LEED green building rating system or any other green building standard; an assessment of the health, environmental and energy-related benefits achieved in comparison with a base-case code compliant project (including projected energy savings and reductions in peak load, reductions in emissions, reductions in storm water runoff and potable water use); a summary of agency findings related to additional investment in energy efficiency pursuant to subparagraphs (i), (ii), and (iii) of paragraph two of subdivision b of section 224.1 of the charter, including any additional investment in energy efficiency considered and the estimated payback time for such investment through savings in energy cost; and the total value of capital allocations in each fiscal year, by city agency, of projects subject to, and exempted by the mayor for each of paragraph one and subparagraphs (i), (ii) and (iii) of paragraph two of subdivision b, paragraphs one and two of subdivision c and subdivision d of section 224.1 of the charter, as well as a list and brief description, by agency, of such exempted projects, including square footage and project cost.
§2. This local law shall take effect immediately upon enactment.
LF
LS#326
2/18/10
RBU/TNN
Int. No. 0379-2006