← All bills

Int 1185-2023

Cleaning of catch basins and reports on catch basin cleanups and maintenance.

IntroductionFiledCommittee on Environmental Protection, Resiliency and Waterfrontsintroduced 2023-09-14

Filed — closed without being enacted.

Official record · Legistar

Agenda: 2023-09-14Passed: 2023-12-31

Summary

This bill would require the commissioner of environmental protection to submit reports on the citywide catch basin inspections, cleanups, maintenance and repair, by community district and also ensure that catch basins are inspected, at a minimum of, once every year and are repaired or unclogged at least five days after inspection or the receipt of a complaint about a clogged or malfunctioning catch basin.

Committee on Environmental Protection, Resiliency and WaterfrontsDepartment of Environmental Protection and Office of Long Term Planning and Sustainability and Office of Recovery and Resiliency.

How it compares

18% of similar bills passed

9 passed · 41 died

This bill: 108 days in committee

Similar bills: median 562 days · 419 days when passed

Sponsors (13)

Public Advocate Jumaane Williams(prime)

Lifecycle

IntroducedIntroduced by Council
2023-09-14 · City Council
ActionReferred to Comm by Council
2023-09-14 · City Council
ClosedFiled (End of Session)
2023-12-31 · City Council

Heard at (1)

City Council · 2023-09-14 · 1:30 PM · Council Chambers - City Hall

Attachments (5)

Full text
Be it enacted by the Council as follows: Section 1. Section 24-503 of the administrative code of the city of New York is amended by adding a new subdivision f to read as follows: f. The commissioner of environmental protection shall submit quarterly reports to the mayor, the speaker of the council and the public advocate regarding the inspection, cleanup, maintenance and repair of catch basins, disaggregated by community district. Inspections will be conducted as follows: 1. Two levels of inspection for maintenance. Tier 1 inspection shall be required on a biannual basis of commercial zones, flood zones (as per the NYC Flood Hazard Mapper), and residential areas not in flood zones, but prone to flooding (as per the NYC Stormwater Flood Map); and 2. Tier 2 inspection. This inspection shall be required on an annual cycle and shall include catch basins around parks, leaves, branches, and shall include all remaining catch basins. e. The commissioner of environmental protection shall also ensure that such catch basins are inspected, at a minimum, once every year, and are unclogged or repaired within five days after an inspection or the receipt of a complaint about a clogged or malfunctioning catch basin. Catch basins not unclogged or repaired within five days after an inspection or the receipt of a complaint shall be identified in the quarterly report. �2. This local law takes effect immediately. Session 12 SS LS 3140 6/17/22 11:24am Session 11 SS Int. 1845-2020 LS # 11951 1/10/20