Int 0420-2022
Fees for the installation of solar power energy systems.
IntroductionFiledCommittee on Environmental Protection, Resiliency and Waterfrontsintroduced 2022-05-19
Filed — closed without being enacted.
Official record · Legistar
Agenda: 2022-05-19Passed: 2023-12-31
Summary
This bill would exempt solar installations from any fees in connection with an application for a street crane permit for such installations.
Committee on Environmental Protection, Resiliency and Waterfronts — Department of Environmental Protection and Office of Long Term Planning and Sustainability and Office of Recovery and Resiliency.
How it compares
10% of similar bills passed
5 passed · 45 died
This bill: 591 days in committee
Similar bills: median 583 days · 242 days when passed
Compared against 50 Introduction bills in Committee on Environmental Protection, Resiliency and Waterfronts.
Ranked by how closely each matches this bill's topic — closest first:
Int 0347-2024
Fees for the installation of solar power energy systems.
671dFiled
Int 1183-2023
Installation of solar photovoltaic systems on city-owned property.
108dFiled
Int 0353-2024
Installation of solar photovoltaic systems on city-owned property.
210dEnacted
Int 0239-2022
Education and outreach regarding solar and green roof systems.
347dEnacted
Int 0983-2023
Mandating the construction of solar canopies in certain parking lots.
264dFiled
Int 1222-2025
Providing notification to public officials regarding the installation of energy storage systems.
280dFiled
+ 44 more comparable bills
Sponsors (16)
Lifecycle
IntroducedIntroduced by Council
2022-05-19 · City Council
ActionReferred to Comm by Council
2022-05-19 · City Council
ActionRe-referred to Committee by Council
2023-03-07 · City Council
ClosedFiled (End of Session)
2023-12-31 · City Council
Heard at (1)
City Council · 2022-05-19 · 1:30 PM · HYBRID HEARING - Council Chambers - City Hall
Attachments (5)
- Summary of Int. No. 420
- Int. No. 420
- May 19, 2022 - Stated Meeting Agenda
- Hearing Transcript - Stated Meeting 5-19-22
- Minutes of the Stated Meeting - May 19, 2022
Full text
Be it enacted by the Council as follows:
Section 1. Article 112 of title 28 of the administrative code of the city of New York is amended by adding a new section 28-112.2.1 to read as follows:
� 28-112.2.1 Fee exemption for solar installations. No fee shall be required in connection with an application for a street crane permit for the installation on a roof of solar thermal and solar electric (photovoltaic) collectors, panels and/or modules and their supporting equipment.
� 2. This local law takes effect 120 days after it becomes law and shall be applicable to any construction documents pending before the department of buildings on such effective date and the commissioner of buildings shall take such measures as are necessary for its implementation, including the promulgation of rules, prior to such effective date.
Session 12
AV
LS 8926
4/23/22
Session 11
BJR
LS #121
Int. 430-2018