Int 0347-2024
Fees for the installation of solar power energy systems.
IntroductionFiledCommittee on Environmental Protection, Resiliency and Waterfrontsintroduced 2024-02-28
Filed — closed without being enacted.
Official record · Legistar
Agenda: 2024-02-28Passed: 2025-12-31
Summary
This bill would exempt solar installations from any fees in connection with an application for a street crane permit for such installations.
Committee on Environmental Protection, Resiliency and Waterfronts — Department of Environmental Protection and Office of Long Term Planning and Sustainability and Office of Recovery and Resiliency.
How it compares
10% of similar bills passed
5 passed · 45 died
This bill: 671 days in committee
Similar bills: median 583 days · 242 days when passed
Compared against 50 Introduction bills in Committee on Environmental Protection, Resiliency and Waterfronts.
Ranked by how closely each matches this bill's topic — closest first:
Int 0420-2022
Fees for the installation of solar power energy systems.
591dFiled
Int 1183-2023
Installation of solar photovoltaic systems on city-owned property.
108dFiled
Int 0353-2024
Installation of solar photovoltaic systems on city-owned property.
210dEnacted
Int 0239-2022
Education and outreach regarding solar and green roof systems.
347dEnacted
Int 0983-2023
Mandating the construction of solar canopies in certain parking lots.
264dFiled
Int 1222-2025
Providing notification to public officials regarding the installation of energy storage systems.
280dFiled
+ 44 more comparable bills
Sponsors (7)
Lifecycle
IntroducedIntroduced by Council
2024-02-28 · City Council
ActionReferred to Comm by Council
2024-02-28 · City Council
HeardHearing Held by Committee
2024-03-01 · Committee on Environmental Protection, Resiliency and Waterfronts
HeldLaid Over by Committee
2024-03-01 · Committee on Environmental Protection, Resiliency and Waterfronts
ClosedFiled (End of Session)
2025-12-31 · City Council
Heard at (2)
Committee on Environmental Protection, Resiliency and Waterfronts · 2024-03-01 · 1:00 PM · 250 Broadway - Hearing Room, 16th Floor
City Council · 2024-02-28 · 1:30 PM · Council Chambers - City Hall
Attachments (8)
- Summary of Int. No. 347
- Int. No. 347
- February 28, 2024 - Stated Meeting Agenda
- Hearing Transcript - Stated Meeting 2-28-24
- Minutes of the Stated Meeting - February 28, 2024
- Committee Report 3/1/24
- Hearing Testimony 3/1/24
- Hearing Transcript 3/1/24
Full text
Be it enacted by the Council as follows:
Section 1. Article 112 of title 28 of the administrative code of the city of New York is amended by adding a new section 28-112.2.1 to read as follows:
� 28-112.2.1 Fee exemption for solar installations. No fee shall be required in connection with an application for a street crane permit for the installation on a roof of solar thermal and solar electric (photovoltaic) collectors, panels and/or modules and their supporting equipment.
� 2. This local law takes effect 120 days after it becomes law and shall be applicable to any construction documents pending before the department of buildings on such effective date and the commissioner of buildings shall take such measures as are necessary for its implementation, including the promulgation of rules, prior to such effective date.
Session 13
LS 8926
2/5/24
Session 13
AV
LS 8926
4/23/22