← All bills

Int 0347-2024

Fees for the installation of solar power energy systems.

IntroductionFiledCommittee on Environmental Protection, Resiliency and Waterfrontsintroduced 2024-02-28

Filed — closed without being enacted.

Official record · Legistar

Agenda: 2024-02-28Passed: 2025-12-31

Summary

This bill would exempt solar installations from any fees in connection with an application for a street crane permit for such installations.

Committee on Environmental Protection, Resiliency and WaterfrontsDepartment of Environmental Protection and Office of Long Term Planning and Sustainability and Office of Recovery and Resiliency.

How it compares

10% of similar bills passed

5 passed · 45 died

This bill: 671 days in committee

Similar bills: median 583 days · 242 days when passed

Sponsors (7)

Lifecycle

IntroducedIntroduced by Council
2024-02-28 · City Council
ActionReferred to Comm by Council
2024-02-28 · City Council
HeardHearing Held by Committee
2024-03-01 · Committee on Environmental Protection, Resiliency and Waterfronts
HeldLaid Over by Committee
2024-03-01 · Committee on Environmental Protection, Resiliency and Waterfronts
ClosedFiled (End of Session)
2025-12-31 · City Council

Heard at (2)

Committee on Environmental Protection, Resiliency and Waterfronts · 2024-03-01 · 1:00 PM · 250 Broadway - Hearing Room, 16th Floor
City Council · 2024-02-28 · 1:30 PM · Council Chambers - City Hall

Attachments (8)

Full text
Be it enacted by the Council as follows: Section 1. Article 112 of title 28 of the administrative code of the city of New York is amended by adding a new section 28-112.2.1 to read as follows: � 28-112.2.1 Fee exemption for solar installations. No fee shall be required in connection with an application for a street crane permit for the installation on a roof of solar thermal and solar electric (photovoltaic) collectors, panels and/or modules and their supporting equipment. � 2. This local law takes effect 120 days after it becomes law and shall be applicable to any construction documents pending before the department of buildings on such effective date and the commissioner of buildings shall take such measures as are necessary for its implementation, including the promulgation of rules, prior to such effective date. Session 13 LS 8926 2/5/24 Session 13 AV LS 8926 4/23/22