Int 1656-2019
Requiring the dept of environmental protection to report on green infrastructure.
IntroductionFiledCommittee on Environmental Protectionintroduced 2019-08-14
Filed — closed without being enacted.
Official record · Legistar
Agenda: 2019-08-14Passed: 2021-12-31
Summary
This bill would require the Department of Environmental Protection to report on the number and types of green infrastructure resources that are maintained and operated in each borough and council district.
Committee on Environmental Protection — Department of Environmental Protection and Office of Long Term Planning and Sustainability and Office of Recovery and Resiliency.
How it compares
36% of similar bills passed
18 passed · 32 died
This bill: 870 days in committee
Similar bills: median 676 days · 273 days when passed
Compared against 50 Introduction bills in Committee on Environmental Protection.
Ranked by how closely each matches this bill's topic — closest first:
Int 1606-2019
Requiring the department of environmental protection to post a map of green roofs online.
932dFiled
Int 1543-2019
Notice for the installation of bioswales or rain gardens.
968dFiled
Int 0383-2018
Annual report on drainage infrastructure.
1430dFiled
Int 0636-2015
Annual report on drainage infrastructure.
1073dFiled
Int 2425-2021
Requiring borough commissioners in the department of environmental protection.
62dEnacted
Int 0399-2010
Increasing native biodiversity in public landscapes.
832dEnacted
+ 44 more comparable bills
Sponsors (3)
Lifecycle
IntroducedIntroduced by Council
2019-08-14 · City Council
ActionReferred to Comm by Council
2019-08-14 · City Council
ClosedFiled (End of Session)
2021-12-31 · City Council
Heard at (1)
City Council · 2019-08-14 · 1:30 PM · Council Chambers - City Hall
Attachments (5)
- Summary of Int. No. 1656
- Int. No. 1656
- August 14, 2019 - Stated Meeting Agenda with Links to Files
- Hearing Transcript - Stated Meeting 8-14-19
- Minutes of the Stated Meeting - August 14, 2019
Full text
Be it enacted by the Council as follows:
Section 1. Chapter 5 of title 24 of the administrative code of the city of New York is amended by adding a new section 24-531 to read as follows:
� 24-531 Green infrastructure. a. Definitions. As used in this section, the following terms have the following meanings:
Green infrastructure. The term "green infrastructure" means a source control measure that uses or mimics natural systems to manage stormwater runoff.
Non-technological source control measure. The term "non-technological source control measure" means a source control measure, such as operational strategies, procedural changes to design and construction protocols or performance standards that does not use technology to control stormwater.
Source control measure. The term "source control measure" means any stormwater management practice designed to reduce or slow the flow of stormwater into a combined sanitary and stormwater sewer or a separate stormwater sewer.
Technological source control measure. The term "technological source control measure" means a source control measure that uses a technology to control stormwater.
b. Report on green infrastructure. No later than October 1, 2019, and quarterly thereafter, the department shall post on its website and submit to the speaker of the council a report on green infrastructure. Such report shall include, but need not be limited to, the following information for the preceding quarter, disaggregated by council district and borough:
1. The total number and types of operational source control measures, and each such source control measure's location;
2. The total number and types of operational green infrastructure, and each such green infrastructure's location;
3. The total number and types of source control measures under construction, and each such source control measure's location;
4. The total number and types of green infrastructure under construction, and each such green infrastructure's location;
5. The total number and types of source control measures that will be constructed within the next year, and each such source control measure's proposed location;
6. The total number and types of green infrastructure that will be constructed within the next year, and each such green infrastructure's proposed location;
7. The total number of non-technological source control measures the department has implemented; and
8. The total number of technological source control measures the department has implemented.
� 2. This local law takes effect immediately.
JEF
LS 10965
7/23/19
2
1